Cyberabad Site visitors Police introduced site visitors diversions round BHEL junction
| Photograph Credit score: Deal with @CYBTRAFFIC on X
Motorists and commuters in Hyderabad may face inconvenience as BHEL junction work is being taken up on March 7 and eight, 2025. The commissioning and shifting of the Part-II 1500 mm PSC pipeline to a brand new MS pipeline alongside the Nationwide Freeway at BHEL shall be undertaken to stop future inconvenience.
The venture, as per the advisory issued by the Cyberabad site visitors police, requires a 48-hour shutdown of the MWSS Part-II Water Therapy Plant and the 1500 mm diameter PSC pumping important from Kalabgoor to Hydernagar, resulting in site visitors diversions for the interval.
Site visitors diversion
Site visitors from Patancheru in the direction of Chandanagar shall be diverted by way of the brand new BHEL flyover whereas these travelling from Patancheru in the direction of Lingampally and Nallagandla shall be required to make use of the service highway at BHEL flyover, take a proper flip at CMR Buying Mall and continuing by way of the underpass.
For commuters travelling from Lingampally to Chandanagar, site visitors shall be redirected by way of BHEL Circle, passing by way of Zaheerabad Bus Cease and continuing onto the BHEL flyover to succeed in their vacation spot. These commuting from Ameenpur in the direction of Chandanagar might want to take a diversion at Sridevi Theatre, turning proper in the direction of BHEL X Highway earlier than reaching Chandanagar.
Given the anticipated congestion, travellers are suggested to plan their journeys upfront and go for alternate routes wherever doable.
Revealed – March 07, 2025 12:10 pm IST
The put up Site visitors diversions round BHEL junction on March 7 and eight appeared first on World On-line.